Critical Path Mapping Whiteboard System®

    
 

All of the items listed below are included with this whiteboard kit.

Item #Qty.Description
CPM1334B1Critical Path Mapping 3' x 4' Whiteboard for up to 13 actvities
CH33-1A525Magnetic cardholders, 3" x 3", 5 colors: White, Yellow, Blue, Green, Red
CD33-A102Packages of 10 sheets (120 total) card inserts in 10 colors perforated 6-up to fit Magnatag #CH33 3" x 3" cardholders
CD33-CPM-NODE-A101Package of 10 sheets card inserts with PRINTED NODE SYMBOL in 10 colors perforated 6-up to fit Magnatag #CH33 3" x 3" cardholders
CH16-1A515Magnetic cardholders, 1" x 6", 5 colors: White, Yellow, Blue, Green, Red
CD16-A102Packages of 10 sheets (240 total) card inserts in 10 colors perforated 12-up to fit Magnatag #CH16 1" x 6" cardholders
DCD-11LetterEasy CD/ROM Card Keying Lettering System with templates for computer printing your Magnatag® Card Inserts and T-Cards
S-CR3M-1A515Magnet Cir Status Signal, 3" 5 Asst. #1
S-CR3M-CPM-1A5153" diameter write-on magnet circle printed node symbols in 5 colors
S-CR58M-1A550Magnet circle status signals, 5/8" dia. 5 colors, assortment #1
TP18-K3Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Black
TP14-K2Rolls of 1/4" x 324" PreciseLine® removable-adhesive bold line chart tape Black
TP14-R3Rolls of 1/4" x 324" PreciseLine® removable-adhesive bold line chart tape Red
TP18-R2Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Red
TP18-BL1Roll of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Blue
TP18-GN1Roll of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Green
AV-C75-K1Set(s) of 122 press-on 3/4" vinyl die-cut capital black letters (removable, not reusable)
AV-N75-K1Set(s) of 125 press-on 3/4" vinyl die-cut black numbers (removable, not reusable)
CJK9V-M-W1Magnetic ChartJackets for 12" x 9" Charts, White
BX-P21Magnet Storage Box, transparent plastic, 13" x 9" x 2"
YPB-A41Set(s) of 4 Dry-Erase bullet-point pens, 4 colors: Black, Red, Green, Blue
YPC-A41Set(s) of 4 Dry-Erase chisel-point markers, 4 colors: Black, Red, Green, Blue
CL-0818 oz. pump-spray bottle of Panda Brand Whiteboard Cleaner and Conditioner
EPH-31Whiteboard Combination Panda Brand® Felt Eraser and Pen-holder that magnetically clings to the steel board surface. Up to 4 pens clip into the eraser. Patented.
PW-51Pack of 5 large lint-free board wipes
WAK51Pkg of 5 WakTack® magnets (assorted colors), with press-on labels

Board Option

Frame Color

Frame Option

Frame Option

QTYPrice Each
One$619
2 - 4$600
5 - 9$582
10 - 24$563
25 +$545