4x6' magnetic CPM- Project mapping Board for up to 26 Activities.QTY
Wall-mounted framed board with magnet kit#CPM2646M$899
same system built into a RollAround stand#CPM2646M-ZVS$1458

Critical path mapping, like earlier Gantt and PERT Charts, targets project finish dates, prioritizes activities and shows the obstacles to meeting deadlines and completion dates while motivating your team.

You see and track at a glance the critical path of work to be done, under way, who's doing it and the work critical to the project's completion.

Big 3" x 3" magnetic cardholders in 5 colors show the CPM activity nodes positioned on the black tape project map timelines with the critical path plotted in bold red tape. (See How it Works below)

The upper mapping section of the board has a faint Ghost-Grid background for neatly displaying your map. The itemized, color-coded, numbered, activity line-item list table on the lower half displays activity subjects, start and finish times and color-flags the critical activities. You can also write on the board in 4 colors with the dry-erase pens and make fast changes by moving magnets. It's completely flexible for tailoring the map to show your exact project critical path.

How It Works
Order Here:
CPM-Projectboard
Magnetic Critical Path Mapping board Kits.

Board
HxW
# of
activities



With Magnet Kit
Qty
Same on
RollAround Stand
Qty
3x4'13$599#CPM1334M$958#CPM1334M-ZVS
4x6'26899#CPM2646M1458#CPM2646M-ZVS
4x8'391079#CPM3948M2008#CPM3948M-ZVS
Click item for details
frame choice & options
Kits include: a magnetic dry-erase steel framed whiteboard heat-fused printed for this system, magnetic cardholders in 5 colors and card inserts in 10 colors for activity mapping and planning, card keying PC / Mac node card insert template, for earliest Start / Finish, latest Start / Finish and activity duration, magnetic, big 3" circle node printed magnets for quick mapping, 5 magnetic signal colors for tracking the critical path or to create your own special codes, red, black, green and blue line tapes in 2 widths for mapping activities, press-on 3/4" black press-on die-cut letters and numbers for board title, patented magnetic ChartJacket® for displaying project plan documents, dry-erase write-on tools and board maintenance supplies, WakTack® magnets for document display and magnet storage box.
RollAround Stand Models Include: Same kit as above.
QUESTION about this product?: click here
IMPORTANT PLEASE MEASURE THE WALL SPACE where you want to mount the board you select to make sure it will fit. Also please measure to make sure it will clear your doorways, corners, staircases and elevators while being transported to your mounting site. Note: add six (6) inches to the board height x width for overall size including the shipping container.

For wall space requirements add two (2) inches to board size height and width.

Order Here:
Order Additional
CPM Node Magnets and inserts
SIZEPkg Qty
Pkgs.
3x3" cardholders
3"5$16.00#CH33
Click item for details
3x3" node
Card-insert
3x3"10$8.69#CD33
Click item for details
3" circle Node
printed magnet
3"5$24.99#S-CR3M-CPM
Click item for details
3" circle magnets
3"5$19.00#S-CR3M
Click item for details