3'h x 4'w 24 rows x task columnsQTY
complete with magnets & write-on tools#IPC34M$499
same with write-on tools#IPC34M$499

Just turn over the 2-sided FlipOver® magnet from yellow (tasks to do) to Green (done), or use the red and black pen colors on the board to show the progress in each ISO team problem task assignment against the process step columns across. Write on the magnet, too. One glance tells you the status in each stage, and displays it so everybody can see the overall effort.

Board columns across read (l-r): TEAM LEADER / ASSIGNMENT / AUDIT / PROB. IDEN. / IMPR. PLAN / CORR. ACT. / AUDIT / CORR. PROB. / TRAINING / NOTES

Order Here:
ISO 9000 Progress Audit
Magnetic Whiteboard SystemKits
Board
h x w
Rowswith Magnets &
Write-on Tools
Qtywith
Write-on Tools
Qty
3' x 4'24#IPC34M$499#IPC34T$429
Click item # for details, frame choice, options and Quantity Prices
Write-on tools include: dry-erase pens (4 colors), 8 oz. board cleaner / conditioner, magnetic eraser / pen holder, and lint-free board wipes.
Magnet kit includes: write-on tools, 40 1" x 2" FlipOver® write-on magnets (green on one side and yellow on the reverse side), magnetic status signals (10 colors), press-on adhesive letter & number sets and line tape.
Note: The magnets and supplies in each of these kits were carefully selected to perform the board task specified. Click the individual kit number in the above price chart to see a full itemized list in each kit, with descriptions and a link to detailed information on reordering and related items to consider.
IMPORTANT PLEASE MEASURE THE WALL SPACE where you want to mount the board you select to make sure it will fit. Also please measure to make sure it will clear your doorways, corners, staircases and elevators while being transported to your mounting site. Note: add six (6) inches to the board height x width for overall size including the shipping container.

For wall space requirements add two (2) inches to board size height and width.

Click Here for board weights.

Related Items
ISO Procedure Update
ISO Procedure Update ™ #PUB