Critical Path Mapping Whiteboard System®

    
 
Show What's Happening with U-Word-IT: At no extra charge, you can change, replace, add-to or delete this board's printed words.
Click the "Modify Board" tab below, follow the easy instructions, and order it here online.
We will ship it to you in 3 business days. These custom-worded boards are not returnable.

All of the items listed below are included with this whiteboard kit.

Item #Qty.Description
CPM2646B1Critical Path Mapping 4' x 6' Whiteboard for up to 26 actvities
CH16-1A525Magnetic cardholders, 1" x 6", 5 colors: White, Yellow, Blue, Green, Red
CD16-A103Packages of 10 sheets (360 total) card inserts in 10 colors perforated 12-up to fit Magnatag #CH16 1" x 6" cardholders
CH33-1A550Magnetic cardholders, 3" x 3", 5 colors: White, Yellow, Blue, Green, Red
CD33-A103Packages of 10 sheets (180 total) card inserts in 10 colors perforated 6-up to fit Magnatag #CH33 3" x 3" cardholders
CD33-CPM-NODE-A102Packages of 10 sheets card inserts with PRINTED NODE SYMBOL in 10 colors perforated 6-up to fit Magnatag #CH33 3" x 3" cardholders
DCD-11LetterEasy CD/ROM Card Keying Lettering System with templates for computer printing your Magnatag® Card Inserts and T-Cards
S-CR3M-1A525Magnet Cir Status Signal, 3" 5 Asst. #1
S-CR3M-CPM-1A5253" diameter write-on magnet circle printed node symbols in 5 colors
S-CR38M-A1050Magnet circle status signals, 3/8" dia. 10 colors
TP18-K3Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Black
TP14-K3Rolls of 1/4" x 324" PreciseLine® removable-adhesive bold line chart tape Black
TP14-R4Rolls of 1/4" x 324" PreciseLine® removable-adhesive bold line chart tape Red
TP18-R3Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Red
TP18-BL1Roll of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Blue
TP18-GN1Roll of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Green
AV-C75-K1Set(s) of 122 press-on 3/4" vinyl die-cut capital black letters (removable, not reusable)
AV-N75-K1Set(s) of 125 press-on 3/4" vinyl die-cut black numbers (removable, not reusable)
CJK9V-M-W1Magnetic ChartJackets for 12" x 9" Charts, White
BX-P21Magnet Storage Box, transparent plastic, 13" x 9" x 2"
YPB-A42Set(s) of 4 Dry-Erase bullet-point pens, 4 colors: Black, Red, Green, Blue
YPC-A41Set(s) of 4 Dry-Erase chisel-point markers, 4 colors: Black, Red, Green, Blue
CL-0818 oz. pump-spray bottle of Panda Brand Whiteboard Cleaner and Conditioner
EPH-31Whiteboard Combination Panda Brand® Felt Eraser and Pen-holder that magnetically clings to the steel board surface. Up to 4 pens clip into the eraser. Patented.
PW-51Pack of 5 large lint-free board wipes
WAK51Pkg of 5 WakTack® magnets (assorted colors), with press-on labels

Board Option

Frame Color

Frame Option

Frame Option


How To Video
POINT and CLICK on YELLOW highlight
areas to change, add or remove printing on this whiteboard.

Zoom In

Zoom Out

Reset

Full Screen
X

Board h x w:4x6'
# of activities:26
QTYPrice Each
One$959
2 - 4$930
5 - 9$901
10 - 24$872
25 +$843