Product code: PS

Project Feedback & Comment StatusBoards Magnetic Dry-Erase Whiteboard System

A few well-chosen words are often better than all the numbers. 4 Board sizes; 16 to 70 rows

The most effective way to make sure everyone knows the situation is to just "tell it like it is". Do it here so all can see it 24/7. The beauty of this Project Management Status Whiteboard system is it can be as simple or as detailed as you need: You can post the project name using the long magnetic cardholders with as much data or as little as needed and can instantly reposition them for priority against the numbered lines. Also post magnetic status symbols in 10 color codes to flash trouble spots needing attention.

If you would like some help from one of our experienced design specialists, please contact us or call us at 800 624 4154 or email us at sales@magnatag.com
Customize online at NO extra cost
You can personalize titles and headers on your board using our Design-it Editing tool. To access the tool look for the symbol before adding to your cart
Order Here
Capacities, sizes and options
Ships in 5 business days or less!
#PS34M
Quantity
Price
One
$809
2 - 4
$783
5 - 9
$762
10 - 24
$734
25 +
$713
Specifications
Board h x w: 3' x 4'
Rows: 25
with Magnets & Dry-erase Tools
Board Option: BoldLyne Frame
Frame Option: Silver
In the box
PS34B
1
3' x 4' porcelain-like steel whiteboard, framed, with 25 numbered project line spaces, heat-fused printed.
20
Magnetic cardholders, 1" x 10", 5 colors: White, Yellow, Blue, Green, Red for line items
2
Packages of 10 sheets (160 total) card inserts in 10 colors perforated 9-up to fit Magnatag #CH110 1" x 10" cardholders
50
Magnet circle status signals 1/2" dia. 10 colors
1
Magnet Storage Box, transparent plastic, 13" x 9" x 2"
1
Set(s) of 4 Dry-Erase Bullet-point board markers, 4 colors: Black, Red, Green, Blue
1
Set(s) of 4 Dry-Erase chisel-point board markers, 4 colors: Black, Red, Green, Blue
1
Whiteboard Combination PandaBoard® Brand Felt Eraser and Pen-holder that magnetically clings to the steel board surface. Up to 4 pens clip into the eraser. Patented.
1
8 oz. pump-spray bottle of PandaBoard® Brand Whiteboard Cleaner and Conditioner
1
Pack of 5 large lint-free board wipes
1
Pkg of 2 WakTack® Rare Earth Magnets for tacking paper notes on the board, 2 colors. Patented. for tacking paper documents to the whiteboard.
FAQs
Frequently asked questions about this product
What is included with my magnetic whiteboard?
Each whiteboard system offers one or more kit options tailored specifically for that system. Each includes the same high quality, magnetic dry-erase whiteboard. To view and compare the contents of each kit option, select the board item(s) in the Price Chart above and click the “What’s Included” tab.
What options are available for my magnetic whiteboard?
For a list of available board options, including: factory installed board trays, frame color choices, stands and other options, select the board item in the price chart above and scroll to the “Features & Options” tab.
How do I hang my new board?
Your BoldLyne® framed Magnatag® board comes with two hanging options: Patented Safety Hooks and FrameKlamp SlideChannel wall hangers. You can view an installation video of the two options or download the instructions for either by clicking these links: Safety Hook Installation or FrameKlamp Installation. Fastener hardware is not included. Please make sure the fasteners you use are appropriate for your wall.
What are the exact dimensions and weights of the boards?
For exact dimensions, add 1-1/2" to the listed board height and width. For more details about our whiteboards and for board weights, click here.
What kind of pens should I use on my board?
For best results use the Magnatag® PandaBoard® dry-erase markers provided with your board.
How do I clean my board?
For best results use the Magnatag® PandaBoard® Brand Cleaner and Conditioner with the large lint-free board wipes provided with your board. Also see care and cleaning information here.
Related Products
Project Status White Board