Over 2300 Job-Specific and All-Purpose Magnetic Whiteboard Kits
Made in USA flag

Critical Path Mapping CPM-ProjectBoard Magnetic Dry-Erase Whiteboard with CPM Symbols

3 sizes for 13, 26 or 39 activities

Do your project team members really see the critical path to your project deadline? This board shows it. It gives your team the tool to break complex projects down to show and find the most efficient, easiest and fastest path to completion.

Critical path mapping, like earlier Gantt and PERT Charts, targets project finish dates, prioritizes activities and shows the obstacles to meeting deadlines and completion dates while motivating your team. You see and track at-a-glance the critical path of work to be done, under way, who's doing it and the work that's critical to the project's completion.

Big 3" x 3" magnetic cardholders in 5 colors show the CPM activity nodes positioned on the black tape project map timelines with the critical path plotted in bold red tape. (See How it Works below.) The upper mapping section of the board has a faint Ghost-Grid background for neatly displaying your map. The itemized, color-coded, numbered, activity line-item list table on the lower half displays activity subjects, start and finish times and color-flags the critical activities. You can also write on the board in 4 colors with the dry-erase pens and make fast changes by moving magnets. It's completely flexible for tailoring the map to show your exact project critical path.

If you would like some help from one of our experienced design specialists, please contact us or call us at 800 624 4154 or email us at sales@magnatag.com
At NO extra cost, Using our Design-it Editing tool, you can personalize titles and headers on your board. To access the tool look for the symbol before adding the item to your cart
Product code: CPM
Share with Email Tweet Share Share 
Ships in 5 business days or less!
17910623458
1
1/2" Ghost-Grid for a neat presentation. Visible up close, but "disappears" when you step back a little.
2
Dry-erase pens in 4 colors to write anywhere on the board.
3
Lettered Activity Rows
4
Magnetic 1" x 6" cardholders in 5 colors and card inserts in 10 colors for up to 50 color-combination codes. Use them to post activity name. Card color can match node magnet and insert color.

Download your card-keying templates here.
5
Magnetic 3/8" status signals in 10 colors can show critical path, or use them to flag other data.
6
Data posting area to plan, track, and post earliest and latest activity start and finish, preceding activities, and activity duration.
7
3" magnetic circle printed node symbols (5 colors) for quick, card free mapping. Use damp or dry-erase pens.
8
Write activity data in the card node diagrams:
ES = Earliest Start
EF = Earliest Finish
LS = Latest Start
LF = Latest Finish
A = Activity Letter Code
D = Activity Duration
9
3" x 3" cardholders in 5 colors can show department, assignee, etc. Cards in 10 colors can show activity subject.
10
Charting tape in 4 colors to lay out critical path mapping.

Order Here

Capacities, sizes and options
CD33
#CD33
Packages
White
CD33-W
#CD33-W
Yellow
CD33-Y
#CD33-Y
Lt. Blue
CD33-LBL
#CD33-LBL
Lt. Green
CD33-LGN
#CD33-LGN
Salmon
CD33-SM
#CD33-SM
1st 5 Asst. #1
CD33-1A5
#CD33-1A5
Pink
CD33-PK
#CD33-PK
Med. Green
CD33-MGN
#CD33-MGN
Gray
CD33-GY
#CD33-GY
Orange
CD33-O
#CD33-O
Beige
CD33-BG
#CD33-BG
2nd 5 Asst. #2
CD33-2A5
#CD33-2A5
10 Asst.
CD33-A10
#CD33-A10
Lemon
CD33-LM
#CD33-LM
Tan
CD33-T
#CD33-T
Med. Blue
CD33-MBL
#CD33-MBL
Gold
CD33-GD
#CD33-GD
Dark Beige
CD33-DBG
#CD33-DBG
3rd 5 Asst. #3
CD33-3A5
#CD33-3A5
Red
CD33-R
#CD33-R
Black
CD33-K
#CD33-K
#CD33
Packages of 10Price
1 - 40 @ $12.19
5 - 90 @ $11.82
10 - 240 @ $11.45
25 - 490 @ $11.08
50 +0 @ $10.71
Specifications
  • 3x3" node Card-insert
  • Size: 3x3"
  • Pkg Qty: 10
Download Template

FAQs

Frequently asked questions about this product
What is included with my magnetic whiteboard?
Each whiteboard system offers one or more kit options tailored specifically for that system. Each includes the same high quality, magnetic dry-erase whiteboard. To view and compare the contents of each kit option, select the board item(s) in the Price Chart above and click the “What’s Included” tab.
What options are available for my magnetic whiteboard?
For a list of available board options, including: factory installed board trays, frame color choices, stands and other options, select the board item in the price chart above and scroll to the “Features & Options” tab.
How do I hang my new board?
Your BoldLyne® framed Magnatag® board comes with two hanging options: Patented Safety Hooks and FrameKlamp SlideChannel wall hangers. You can view an installation video of the two options or download the instructions for either by clicking these links: Safety Hook Installation or FrameKlamp Installation. Fastener hardware is not included. Please make sure the fasteners you use are appropriate for your wall.
What are the exact dimensions and weights of the boards?
For exact dimensions, add 1-1/2" to the listed board height and width. For more details about our whiteboards and for board weights, click here.
What kind of pens should I use on my board?
For best results use the Magnatag® PandaBoard® dry-erase markers provided with your board.
How do I clean my board?
For best results use the Magnatag® PandaBoard® Brand Cleaner and Conditioner with the large lint-free board wipes provided with your board. Also see care and cleaning information here.