Product code: CPM

Critical Path Mapping CPM-ProjectBoard Magnetic Dry-Erase Whiteboard with CPM Symbols

3 sizes for 13, 26 or 39 activities

Do your project team members really see the critical path to your project deadline? This board shows it. It gives your team the tool to break complex projects down to show and find the most efficient, easiest and fastest path to completion.

Critical path mapping, like earlier Gantt and PERT Charts, targets project finish dates, prioritizes activities and shows the obstacles to meeting deadlines and completion dates while motivating your team. You see and track at-a-glance the critical path of work to be done, under way, who's doing it and the work that's critical to the project's completion.

Big 3" x 3" magnetic cardholders in 5 colors show the CPM activity nodes positioned on the black tape project map timelines with the critical path plotted in bold red tape. (See How it Works below.) The upper mapping section of the board has a faint Ghost-Grid background for neatly displaying your map. The itemized, color-coded, numbered, activity line-item list table on the lower half displays activity subjects, start and finish times and color-flags the critical activities. You can also write on the board in 4 colors with the dry-erase pens and make fast changes by moving magnets. It's completely flexible for tailoring the map to show your exact project critical path.

If you would like some help from one of our experienced design specialists, please contact us or call us at 800 624 4154 or email us at sales@magnatag.com
Customize at NO extra cost
You can personalize titles and headers on your board using our Design-it Editing tool. To access the tool look for the symbol before adding to your cart
Order Here
Capacities, sizes and options
Ships in 5 business days or less!
#CPM3948M-ZV2-ZH-K
Quantity
Price
One
$3,846
2 - 4
$3,734
5 - 9
$3,615
10 - 24
$3,497
25 +
$3,386
Specifications
Board h x w: 4' x 8'
# of activities: 39
Board Option: Roll-Around Stand, 2 sided
Frame Option: Horizontal Pivot Option
Frame Option: Black Fabric Base
In the box
CPM3948B
1
Critical Path Mapping 4' x 8' Whiteboard for up to 39 actvities
75
Magnetic cardholders, 3" x 3", 5 colors: White, Yellow, Blue, Green, Red
4
Packages of 10 sheets (240 total) card inserts in 10 colors perforated 6-up to fit Magnatag #CH33 3" x 3" cardholders
3
Packages of 10 sheets10 card inserts with PRINTED NODE SYMBOL in 10 colors perforated 6-up to fit Magnatag #CH33 3" x 3" cardholders
30
Magnetic cardholders, 1" x 6", 5 colors: White, Yellow, Blue, Green, Red
3
Packages of 10 sheets (360 total) card inserts in 10 colors perforated 12-up to fit Magnatag #CH16 1" x 6" cardholders
S-CR3B-1A5
30
Magnet circle, damp/dry finish, 3" dia. 5 colors, (yellow, white, tan, light blue, pink)
S-CR3B-CPM-1A5
30
CPM Node, 3" magnet circles, damp/dry finish, 5 colors, (yellow, white, tan, light blue, pink)
100
Magnet circle status signals, 3/8" dia. 10 colors
4
Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Black
4
Rolls of 1/4" x 324" PreciseLine® removable-adhesive bold line chart tape Black
5
Rolls of 1/4" x 324" PreciseLine® removable-adhesive bold line chart tape Red
4
Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Red
2
Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Blue
2
Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Green
1
Set(s) of 122 press-on 3/4" vinyl die-cut capital black letters (removable, not reusable)
1
Set(s) of 125 press-on 3/4" vinyl die-cut black numbers (removable, not reusable)
1
Magnetic ChartJackets®,vertical letter-size 11"h x 8-1/2"w, White
1
Magnet Storage Box, transparent plastic, 13" x 9" x 2"
2
Set(s) of 4 Dry-Erase Bullet-point board markers, 4 colors: Black, Red, Green, Blue
1
Set(s) of 4 Dry-Erase chisel-point board markers, 4 colors: Black, Red, Green, Blue
YEF-K
2
Black Dry-Erase Fine Point pen
1
8 oz. pump-spray bottle of PandaBoard® Brand Whiteboard Cleaner and Conditioner
1
Whiteboard Combination PandaBoard® Brand Felt Eraser and Pen-holder that magnetically clings to the steel board surface. Up to 4 pens clip into the eraser. Patented.
1
Pack of 5 large lint-free board wipes
1
Pkg of 2 WakTack® Rare Earth Magnets for tacking paper notes on the board, 2 colors. Patented.
FAQs
Frequently asked questions about this product
What is included with my magnetic whiteboard?
Each whiteboard system offers one or more kit options tailored specifically for that system. Each includes the same high quality, magnetic dry-erase whiteboard. To view and compare the contents of each kit option, select the board item(s) in the Price Chart above and click the “What’s Included” tab.
What options are available for my magnetic whiteboard?
For a list of available board options, including: factory installed board trays, frame color choices, stands and other options, select the board item in the price chart above and scroll to the “Features & Options” tab.
How do I hang my new board?
Your BoldLyne® framed Magnatag® board comes with two hanging options: Patented Safety Hooks and FrameKlamp SlideChannel wall hangers. You can view an installation video of the two options or download the instructions for either by clicking these links: Safety Hook Installation or FrameKlamp Installation. Fastener hardware is not included. Please make sure the fasteners you use are appropriate for your wall.
What are the exact dimensions and weights of the boards?
For exact dimensions, add 1-1/2" to the listed board height and width. For more details about our whiteboards and for board weights, click here.
What kind of pens should I use on my board?
For best results use the Magnatag® PandaBoard® dry-erase markers provided with your board.
How do I clean my board?
For best results use the Magnatag® PandaBoard® Brand Cleaner and Conditioner with the large lint-free board wipes provided with your board. Also see care and cleaning information here.
Related Products